Installation guide

Head Office: Business & Technology Park, Mallow, Co. Cork. Tel: 022-31200; Fax: 022-31250
Ballyhaunis, Co. Mayo. Tel: 094-9630226; Fax: 094-9630761
M7 Business Park, Naas, Co. Kildare. Tel: 045-843614; Fax: 045-883296
Mountrath, Co. Laois. Tel: 057-8732279; Fax: 057-8732518
Declaration of Site Readiness
Bison ASP Gravity Discharge
Client Date
Address Tank No
A/C Ref
Phone No
Email Warranty
To avoid abortive visits, standing time and or return visits, and consequential costs, we outline
below a list of requirements, which must be met before we attend site for commissioning.
QUESTION
YES / NO
1
Have you received and read the Operation and Maintenance Manual for
your Wastewater Treatment Unit?
2
Has the Wastewater Treatment Unit been installed according to our Bison
ASP Installation procedure? See O&M Manual, page 9.
3
Has a 3 x 2.5 SWA Power Cable been laid from the power source to the
treatment plant? Note: 2 meters spare to be left at the tank.
4
EPS provide an invert distance B (Ref. Page 7) as standard which can be
reduced to suit finished ground level at the time of commissioning.
Is a Neck Extension required for your Wastewater Treatment Unit?
If so an extra charge will be incurred, 150.00 Inc Vat
5
Have you indicated where the Wastewater Treatment Unit neck is to be
cut? (if applicable)
6
Is the Wastewater Treatment Unit and surrounding area free of debris and
rubble?
We confirm that all the above requirements will be met by the following date: _____________
We also understand that standing time or additional site visits due to lack of site readiness will
involve additional charges as set out in the attached Extra Site-Work charge schedule
Signed: ______________________________ Date: ______________
This declaration form must be signed and returned before we can confirm a commissioning date.
Please Note: We require at least 10 working days notice for site attendance.
11