Installation guide

Appendix G: Quick Installation Guide
DO:
Read this O&M Manual including appendices for full details
Keep this manual together with any drawings that were issued and any other communication
(order acknowledge, quotation, etc…)
Take care when offloading the unit – external and internal pipe work & electrical equipment could be damaged!
Ensure adequate ventilation – the treatment plant is part of the foul drainage system and requires venting
(see section “Installation“, p.9)
Use a suitable rated cable to connect the socket inside the Bison ASP unit to the electrical equipment.
DON’T:
Install any Bison ASP unit deeper than the supplied access turret (i.e. do not extend the turret unless
EPS Bison have advised you to do so)
Incorporate a standard household earth leakage circuit breaker (RCD) in the power supply to the unit.
43