Assembly Instruction

1of2
(8)B10CandelabraBaseBulbs60WMaximum
30-45minutes
Identifyandinspectallpartsbeforebeginninginstallation.Checkpackagecontentlistanddiagramsbelowtobesureallpartsare
present.Ifanypartsaremissingordamaged,donotattempttoassemble,install,oroperatethefixture.Contactcustomerserviceforreplacement
parts.
LightSource:
EstimatedAssemblyTime:
Preparation:
ToolsRequired:Flatheadscrewdriver, Phillips screwdriver,pliers,wirecutters,wirestrippers,electricaltape,safetyglasses.
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal.
Package Contents
A
Fixture Loop
x1
B
6” Rod
x2
C
Fixture Body
x1
Hardware Contents
AA
BB
CC
DD
EE
FF
Crossbar
x1
Lock Washer
x2
Hex Nut
x2
Nipple
x1
Canopy
Chain Loop
x1
Canopy Lock
Ring
x1
Ceiling
Canopy
x1
GG
HH
Quick Link
x1
12” Rod with Nipple
x1
F
STEP 1 Install Fixture Loop and Rods to Fixture Body-
A. Determine the Rods (B/C/D) to be assembled to the Fixture Body (F)
according to your hanging height.
B. Pass the supply wires and ground wire through the chosen rods
(B/C/D) and the Fixture Loop (A). Thread the Fixture Body (F), the
chosen Rods (B/C) and the Fixture Loop (A) together. Hand tighten
until snug.
Supply Wires and
Ground Wire
A
B
B
C
D
Figure 1
STEP 2 - Install the Crossbar to the junction box
A. Attach the Crossbar (AA) to the Outlet Box with the head of the
Green Ground Screw facing you. Secure it with Outlet Box Screws
(not included), tighten until snug.
Outlet Box
Outlet Box Screw
(not included)
Green Ground
Screw
AA
Figure 2
STEP 3 Install the Canopy Chain Loop and Nipple-
A. Thread one Hex Nut (CC) to one end of the Nipple (DD) until it is at
least 0.25” from the end. Pass one Lock Washer (BB) over the end of
the Nipple (DD) and thread the Canopy Chain Loop (EE) onto the
Nipple (DD). By using pliers, thread the Hex Nut (CC) against the
Canopy Chain Loop (EE) and hand tighten until snug.
B. Thread another Hex Nut (CC) to the middle of the Nipple (DD). Place
another Lock Washer (BB) over the Nipple (DD) and then thread the
Nipple (DD) into the Crossbar (AA) until the Nipple (DD) is about
0.375” above the Crossbar (AA).
C. Remove the Canopy Lock Ring (FF) from the Canopy Chain Loop
(EE). Place the Ceiling Canopy (HH) over the Canopy Chain Loop
(EE) against the ceiling to determine the correct position of the
Nipple (DD). Thread the Canopy Lock Ring onto the Canopy Chain
Loop (EE). Adjust the Nipple (DD) to allow the Ceiling Canopy (HH)
to rest against the ceiling when held in place by the Canopy Lock
Ring (FF).
Suggested rods for Ceiling
height :
8’ ceiling : use (1) 6” rod and
(1) 12” rod
9’ ceiling : use (1) 6” rod and
(2) 12” rods
10’ ceiling : use (2) 6” rods
and (2) 12” rods
F
D
12” Rod
x1
E
Glass
Shade
x8
Assembly Instruction
Thank you for purchasing product.
Need assistance with parts or assembly? Call customer service

Summary of content (2 pages)