Installation Instructions

11
12
INSTALLATION GUIDE
DETAIL 
Rake / Gable / Barge Treatment
1. 905 Barge Channel shall be installed along all rake /gable edges.
2. Position outside edge of 905 Barge Channel to be flush with the barge rafter.
3. Position 905 Barge Channel over 902 Starter and flush with the leading
edge at eave.
4. Install first fastener 6” from the leading edge of the 904 Starter with #12 screws.
5. Fasten 12” OC and in the outside channel nearest the hemmed edge. Notching the
bottom of the adjoining 905 Barge Channel (min 2”).
(Fig.02.B.)
6. For subsequent pieces, notch the bottom of the adjoining 905 Barge Channel min. 2
(Fig.02B)
7. Miter at ridge line – cut and fold min. 1” over the ridge line.
NOTES
Underlayment
Notch trim lines
905 Barge Channel
905 Barge Channel
Notched piece slides inside
of next channel piece
902 Starter / drip edge
905 Barge Channel
FIG. 02.A
FIG. 02.B
Remaining steps continued on next page
2”
DETAIL  CONTINUED
Rake / Gable / Barge Treatment