Installation Instructions

21
22
INSTALLATION GUIDE
DETAIL 
Panel Installation, Layout, Overlap & Fastening
DETAIL  CONTINUED
Panel Installation, Layout, Overlap & Fastening
1. Starting at the first course, going from right to left, start with a full panel at gable, valley,
hip or sidewall.
2. Notch to first panel 2” (4” in the valley) at the underside of the interlock.
(Fig. 06B)
3. Install five fasteners using the sequencing above with #12 x 1 ½” screws or 8D ringshank
nails. For open rafters and vaulted ceilings, use #8 x ¾” screws.
4. Continue installing first course of panels across to termination point at gable, hip, valley
or sidewall.
5. Notch final panel at the termination point. 2” (4” in the valley) at the underside of the
interlock.
(Fig. 06B)
6. Continue installing panels up the roof randomly. (Fig. 06D)
NOTES
5
3
2 4 1
7. Panels terminate at the center of the ridge.
8. Start and terminate panels tight to gable, valley, hip or sidewall.
9. Exposure shall be ” on sidelap to cover 3 water channels.
10. Exposure on headlap shall be ” when fully engaged.
11. No panel fasteners shall penetrate flashing at gable, valley, hip or sidewall
FIG. 06.A
FIG. 06.C
FIG. 06.D
Panel Sliding into
previous panel
Underlayment
Staggered panel
arrangement
FIG. 06.B