1. Install panels up to bottom of headwall. Notch the headcheck.
2. Cut the last panel transitioning into the headwall both vertically and horizontally to fit
lower right corner condition. Cut and install the next panels(s).
(Fig. 08B)
3. Last panel to be cut both vertically and horizontally to fit lower left corner condition.
(Fig. 08B)
4. Counter flash with transition/headwall 4” x 6” 110° degree metal (provided by others).
5. Install 708 Universal Flashing flush with headwall metal on left and right side of
headwall.
6. Notch panel 4 1/2” at the underside of the interlock.
7. Install 715 Side Flashing to counterflash 110° metal and 708 Universal Flashing.
(Fig. 08B)
NOTES
Provided by others:
Head to Wall Metal 4x6
L Cut
Provided by others:
110° Head Wall Metal
Meridian Panel
For New Construction: Underlayment 4” up sidewall / headwall