Installation Instructions

9
10
INSTALLATION GUIDE
DETAIL 
Eave Treatment
1. Position 902 Starter flush with fascia (Fig. 01.B). Fasten 6-8” OC using #12 x 1 ½” screws or
8d ring shank nails.
2. 902 Starter sits on top of the roof deck so the drip edge is flush with the fascia board.
3. Notch and overlap Starter pieces 1” when joining two pieces together
(Fig.02.C).
4. At hips and valleys the starter shall be notched and mitred to fit corners.
5. Install underlayment on decking and flush with front edge of starter.
6. In high wind areas, fasten the 902 Starter 6-8” OC with #12 x 1 ½” screws.
NOTES
Underlayment
Roof Deck
Roof Deck
Underlayment
902 Starter
902 Starter
Fascia Board
Square up the eave if out of square by snapping a line and adjusting the
starter as needed. If out of square more than a half inch use 901 short
course over the top of standard drip edge wide enough to square the roof.
FIG. 01.A
FIG. 01.B
FIG. 01.C
DETAIL  CONTINUED
Eave Treatment