Installation Instructions

17
18
INSTALLATION GUIDE
DETAIL B
Hip with Underchannel
1. At the eave, position hip underchannel and cut flush with 902 Starter.
2. Install 904 Hip underchannel and fasten to the deck using #12 x 1 ½” screws and
install 12” OC through both sides of outer channel near the hem.
3. Overlap pieces 6”.
4. Optional: In wooded areas, install debris blocker in the middle groove of the
underchannel.
NOTES
904 Hip Underchannel
Underlayment
Trim Lines
FIG. .C
Shingle Trim 400
Meridian Panel
FIG. .D
DETAIL B CONTINUED
Hip Caps