Installation Instructions

39
40
INSTALLATION GUIDE
CLEANING & TOUCHUP
During Installation
MAINTENANCE & CARE
FREEZE/THAW CYCLES
1. Metal shavings need to be removed daily during installation.
2. If you need to touch up finish either during or after installation, use a Touch-Up Kit
matching the stone coated panel finish of your installation.
3. For questions regarding any additional issues, call 916-838-1940.
4. After installation is complete, be sure to clean all debris o of the roof, especially any
metal shavings.
Foot Trac Avoid walking on side laps. See walking instructions at www.rossroofgroup.com
When installing in areas subject to frequent freeze and thaw cycles, always install with an
ice barrier where required.
WALKING INSTRUCTIONS
Correct / Incorrect
1. Step on the headcheck or where the two tiles meet.
2. DO NOT step on a single tiles, make sure each step is placed where both tiles meet.
NOTES
Correct Incorrect