Product Manual

BOX CONTENTS
QTY. PART CODE DESCRIPTION
4 321108300 Outriggers
4 VB-HMLM8X20 Tightening knobs
4 I-C1CAS6 Casters
12 I-CAS5PIN Locking pins
ENGLISH
ASSEMBLY INSTRUCTIONS
3
1
4
2
5
3
Erect the scaffold (one or two
frames high) by following the
manufacturer instructions.
Lock outrigger into place by using two locking pins. If you use
scaffolding with casters, you must first remove the locking pin of the
caster to attach the outrigger and then replace the locking pin to lock
the caster and base of the outrigger.
Install caster into outrigger and
secure it with lock pin. Set caster
brake. Repeat with the other casters.
Firmly tighten the tightening
knob so that the scaffolding
and the outrigger are perfectly
lined up and united.
Place outrigger to end scaffold
frame at a 90° angle to the side
brace.
ESPAÑOL
1
2
3
4
5