Instruction manual

Table Of Contents
OPERATION/CONTROL
37
3.1.2 Power on
Before switching power on, check the following:
Installation check
Make sure that the inverter is installed correctly in a correct place. (Refer to page 7.)
·
Wiring check
Make sure that the main and control circuits are wired correctly.
Make sure that the options and peripheral devices are selected and connected correctly.
(Refer to page 10.)
Switch power on.
Power-on is complete when the POWER lamp is lit correctly and the operation panel (FR-DU04) displays
correct data.