Instruction for Assembly

Table 2 – Complete set of accessories
ASSEMBLY SEQUENCE
! Collect a product in the lying position by front edges from top to
bottom (picture 1).
! Dowels (A-01) are inserted only after PVA glue has poured in
openings.
1. In openings of Ø8 mm in end faces of sidewalls of a box (4, 5, 8,
9) insert dowels (A-01) similar to the picture 4.
2. Connect sidewalls of a box (4, 5, 8, 9) to a facade of a box (6, 10)
between themselves, having clamped eccentrics (V-01) (picture 5).
3. Insert a bottom of a box (2) into a groove of sidewalls of a box
(4, 5, 8, 9) and a facade of a box (6, 10).
4. Connect sidewalls of a box (4, 5, 8, 9) and back wall (3, 7) with
the help of confirmees Ø 7х50 мм (О-02).
A-01 x 22
Ø8х35
C-01 x 22 B-01 x22
Е-01 х 52
Ø3х16
Е-02 x 8
Ø4х16
M-01 x6
R-02/1 x5 к-т
L=350
R-02/2 x5к-т
L=350
J-01 x 6
О-02 х 20
Ø7х50
Р-01 х 1
Glue PVA
L-02/1 x 2
inside
L-02/2 x 2
inside
К-01 х 8
F-01 x 60
Ø2х20
G-01 х 6
I-01 х 8
D-05 х 12
S-02 x 1
D-03 х 12
К
Л
Е
Й
П
В
А
F
-
0
1
R
E
-
0
3
picture
1