Troubleshooting guide

Table Of Contents
188
3300 ICP Technician’s Handbook
Figure 54: Removing the Battery
3. Install the new battery with "+" sign facing up towards you.
- Lift the clip
- Slide the battery into the coin cell holder.
4. Replace the top cover. Using the #1 Phillips screwdriver, tighten the
screw that fastens the top cover to the chassis.
APC-CX(i)
The optional Application Processor Card (APC-CX(i)) allows the system to
host Mitel Standard Linux (MSL) software that can run applications such
as Unified Communicator Mobile. Each of the applications is released with
guidelines defining conditions, performance, and installation
combinations. For information on how to program and use software blades
and services, refer to the MSL documentation on Edocs
(http://edocs.mitel.com.)
After you install the APC-CX(i), install the APC hard drive, and then install
the Mitel Standard Linux software. Refer to “Installing MSL Software on
APC (CX/CXi) or APC-CX(i) II (CX II/CXi II)” on page 105.
Note: You can install the APC-CX(i) in CX and CXi controllers that have
Release 7.1 and higher software.
Note: Only CX PN 50005096 and CXI PN 50005097 support the APC-CX(i).