Engineering Manual

B-108
MXZ-8C60NA
Unit: mm <inch>
Ground for the power supply
("GR"marking position)
Service panel
Handle for moving
2
1
Ground for the transmission line
Ground for concentration control
Handle for moving
From left to right
Terminal connection
For concentration
control
For the
transmission line
For the
branch box
power supply
For the
power supply
Ground for the
branch box
power supply
1067 <42>
450 <17-23/32>
393 <15-15/32>
1338 <52-11/16>
632 <24-7/8>369 <14-17/32>
26 <1-1/32>
362 <14-1/4>
1050 <41-11/32>
Rear Air Intake
Air Discharge
Side Air Intake
Installation Feet
2-U Shaped notched holes
(Foundation Bolt M10<W3/8>)
2-12×36 Oval holes
(Foundation Bolt M10<W3/8>)
42
<1-21/32>
60.5
<2-3/8>
417 <16-13/32>
19 <3/4>370 <14-9/16>
28 <1-1/32>
70
<2-3/4>
25 <1> 330 <13>
225
<8-27/32>
600
<23-5/8>
225
<8-27/32>
53 <2-3/32>
56 <2-7/32>
39.5 <1-9/16>
0
Bottom piping hole
(Knock-Out)
Drain hole
154
<6-1/16>
136
<5-11/32>
45
<1-25/32>
110
<4-11/32>
160
<6-5/16>
160
<6-5/16>
160
<6-5/16>
86 <3-3/8>
81
<3-3/16>
Air intake
Front piping cover
Rear piping cover
Side Air Intake
Rear Air Intake
Handle for
moving
Handle for
moving
2
1
Example of Notes
1/2 inch Conduit
attachment
22.2<7/8>
34.5<1-23/64>
When installing the conduit.
Set the attachment to the
inner side of each panel.
1 inch Conduit
attachment
Scale 1:5
24.7 <31/32>
5<3/16>
60 <2-3/8> 24 <15/16>
101.5 <4>
Right piping hole
(Knock-Out)
Conduit hole
(
24<15/16>Knock-Out)
Conduit hole
(
37<1-15/32>Knock-Out)
Right trunking hole
(Knock-Out)
92 <3-5/8>
60 <2-3/8>
5<3/16>
60 <2-3/8>
55 <2-3/16>
53 <2-3/32>
92
<3-5/8>
26 <1-1/32> 27 <1-1/16>
29 <1-5/32>
73 <2-7/8>
<3-5/8>
Conduit hole
(
37<1-15/32>Knock-Out)
Front trunking hole
(Knock-Out)
Front piping hole
(Knock-Out)
Conduit hole
(
24<15/16>Knock-Out)
55 <2-3/16>27 <1-1/16>
92 <3-5/8>
75 <2-15/16>
73 <2-7/8>26 <1-1/32>
55 <2-3/16>
60
<2-3/8>
5
<3/16>
60 <2-3/8>
<3-5/8>
Conduit hole
(
24<15/16>Knock-Out)
Conduit hole
(
37<1-15/32>Knock-Out)
Rear trunking hole
(Knock-Out)
Rear piping hole
(Knock-Out)
75 <2-15/16>
60 <2-3/8>
92 <3-5/8>
73 <2-7/8>26<1-1/32>
27 <1-1/16> 55 <2-3/16>
55 <2-3/16>
5<3/16>
60 <2-3/8>
<3-5/8>
Piping Knock-Out Hole Details
mm<inch>
Min. 150mm<5-29/32>Min. 1000mm<39-3/8>
FREE
Min. 15mm<19/32>
Min. 15mm<19/32>
Piping and wiring connections
can be made from 4 directions:
FRONT, Right, Rear and Below.
4 PIPING-WIRING DIRECTIONS
3 FOUNDATION BOLTS
2 SERVICE SPACE
1 FREE SPACE (Around the unit)
Please secure the unit firmly
with 4 foundation (M10<W3/8>) bolts.
(Bolts and washers must be
purchased locally.)
Dimensions of space needed
for service access are
shown in the below diagram.
The diagram below shows a basic example.
Explantion of particular details are
given in the installation manuals etc.
Max.
<Foundation bolt height>
FOUNDATION
Service space
Min.
Min.
Min.
Min.
15 <19/32>
500
<19-11/16>
500
<19-11/16>
150
<5-29/32>
30 <1-3/16>
*1