Installation Guide

Barn Door Hardware Kit
ASSEMBLY INSTRUCTIONS
Step 4. CONCRETE Wall Preparation
IF INSTALLING INTO DRYWALL – PLEASE PROCEED TO STEP 7.
Position the rail by measuring up from the door
height (H) + 1 3/4" to the center of the track. Also ensure
a gap of 3/8" at the bottom. Ensure the rail is level and
leave a minimum of 2" from the end of the rail to the side
of the opening (as shown).
If installing with an opening for 80" standard door size,
remove the top trim and cut the side trim horizontally along
the height of the opening.
BARN DOOR HARDWARE KIT
ASSEMBLY INSTRUCTIONS
Step 5. CONCRETE Wall Preparation
Position the rail in place ensuring that it is level, mark the
holes on the rail using a pencil and pre-drill 5/16" holes
into the concrete.
Step 6. CONCRETE Rail Installation
When installing directly into concrete, insert using the
provided anchors and carriage bolts (with washers).
Ensure to un-screw to separate the carriage bolt and
anchor to install correctly, securing with a wrench.
Ensure to insert both stoppers either side of the rail inside
Door Height + 1 3/4"
3/8" (9.5 mm)
Gap under
the door
78 3/4" (2000 mm)
Minimum
2"
(51mm)
1 3/8" (30 mm)
5/16" (8mm)
®
www.millikenmillwork.com
Step 4. CONCRETE Wall Preparation
IF INSTALLING INTO DRYWALL, PLEASE PROCEED TO STEP 7.
Position the rail by measuring up from the door height (H) + 1 3/4" to the
center of the track. Also ensure a gap of 3/8" at the bottom. Ensure the rail
is level and leave a minimum of 2" from the end of the rail to the side of the
opening (as shown).
If installing with an opening for 80" standard door size, remove the top trim
and cut the side trim horizontally along the height of the opening.
Image for bent strap shown
Step 4. CONCRETE Wall Preparation
IF INSTALLING INTO DRYWALL – PLEASE PROCEED TO STEP 7.
Position the rail by measuring up from the door
height (H) + 1 3/4" to the center of the track. Also ensure
a gap of 3/8" at the bottom. Ensure the rail is level and
leave a minimum of 2" from the end of the rail to the side
of the opening (as shown).
If installing with an opening for 80" standard door size,
remove the top trim and cut the side trim horizontally along
the height of the opening.
BARN DOOR HARDWARE KIT
ASSEMBLY INSTRUCTIONS
Step 5. CONCRETE Wall Preparation
Position the rail in place ensuring that it is level, mark the
holes on the rail using a pencil and pre-drill 5/16" holes
into the concrete.
Step 6. CONCRETE Rail Installation
When installing directly into concrete, insert using the
provided anchors and carriage bolts (with washers).
Ensure to un-screw to separate the carriage bolt and
anchor to install correctly, securing with a wrench.
Ensure to insert both stoppers either side of the rail inside
Door Height + 1 3/4"
3/8" (9.5 mm)
Gap under
the door
78 3/4" (2000 mm)
Minimum
2"
(51mm)
1 3/8" (30 mm)
5/16" (8mm)
®
www.millikenmillwork.com
Step 5. CONCRETE Wall Preparation
Position the rail in place ensuring that it is level, mark the holes on the rail
using a pencil and pre-drill 5/16" holes into the concrete.
Step 4. CONCRETE Wall Preparation
IF INSTALLING INTO DRYWALL – PLEASE PROCEED TO STEP 7.
Position the rail by measuring up from the door
height (H) + 1 3/4" to the center of the track. Also ensure
a gap of 3/8" at the bottom. Ensure the rail is level and
leave a minimum of 2" from the end of the rail to the side
of the opening (as shown).
If installing with an opening for 80" standard door size,
remove the top trim and cut the side trim horizontally along
the height of the opening.
BARN DOOR HARDWARE KIT
ASSEMBLY INSTRUCTIONS
Step 5. CONCRETE Wall Preparation
Position the rail in place ensuring that it is level, mark the
holes on the rail using a pencil and pre-drill 5/16" holes
into the concrete.
Step 6. CONCRETE Rail Installation
When installing directly into concrete, insert using the
provided anchors and carriage bolts (with washers).
Ensure to un-screw to separate the carriage bolt and
anchor to install correctly, securing with a wrench.
Ensure to insert both stoppers either side of the rail inside
Door Height + 1 3/4"
3/8" (9.5 mm)
Gap under
the door
78 3/4" (2000 mm)
Minimum
2"
(51mm)
1 3/8" (30 mm)
5/16" (8mm)
®
www.millikenmillwork.com
Step 6. CONCRETE Rail Installation
When installing directly into concrete, insert using the provided anchors and
carriage bolts (with washers). Ensure to un-screw to separate the carriage
bolt and anchor to install correctly, securing a wrench.
Ensure to insert both stoppers on either side of the rail inside the rst hole.