Installation Instructions

The kit supplied with the unit contains 2 lag bolts and 4
toggles with bolts. The wall bracket will be attached to
the wall in 4 places.
Measure the opening where the unit is to be installed.
Mark the center with a vertical line.
Measure up 81 1/2” from the floor. Mark this point on
the wall.
Using a level, draw a horizontal line on the wall at this
height.
Locate at least 2 studs on the back wall. Mark these
points on the horizontal line.
Place the bottom of the wall bracket with tabs on the
horizontal line. Align the center notch on the bracket
with the center line on the wall.
The anti-tip wall bracket has a series of holes. Select 2
holes that match with the located studs. Make sure the
holes selected are on the center of the studs. Mark the
wall at these points.
STEP4 INSTALL ANTI-TIP BRACKET (cont.)
Installation Instructions - Stainless Steel Installation
46
Mark an additional hole at each end of the bracket.
If one of the studs is closer to the end of the bracket,
mark an additional hole towards the center of the
bracket.
Drill 1/2” holes into the wall board at the locations
marked for the toggles to be mounted (not the stud
markings).
Drill 3/16” holes into wooden studs where marked. If
steel stud construction, drill 1/2” holes into the studs
where marked. You will use 2 toggles with the metal
studs.
Install Wall Toggles:
The wall toggles and bolts can be ordered as Service Kit
#WR49X10193. Wall toggles are installed in the drywall
and metal studs for stability. Install the wall toggles as
follows:
Drill 1/2” holes at the wall markings made in the holes at
the ends of the wall bracket.
Hold the metal channel flat against the plastic straps
and slide the channel through the hole.
Plastic Straps
Metal Channel
Two Additional
Hole Locations at
Ends of Brackets
Center
Wall Bracket
Line On Wall
Wall Studs
Line on Wall
Center