Owner's Manual

5
Contents
Safety 2
Instructions for Standard Installation 6
Planning Guide
The Installation Space 7
Dimensions and Clearances 7
Customization Basics 8
Side Panels 8
Refrigerator Location 8
1/4” Framed Panel Dimensions 9
3/4” Overlay Panel Dimensions 10
130° Door Swing 11
90° Door Swing 12
Dispenser Trim 13
Installation Instructions
Tools, Hardware, Materials 14
Grounding the Unit 14
Step 1. Remove Packaging 15
Step 2. Move the Refrigerator into the House 15
Step 3. Install Water Line 15
Step 4. Installation with Filtration System 16
Step 5. Install Side Panels 16
Step 6. Anti-Tip Procedures 16
Step 7. Level Refrigerator 17
Step 8. Alternate Anti-Tip Procedure 18
Step 9. Adjust Door Swing 18
Step 10. Install Grille Panel 19
Step 11. Install 1/4” Framed Panels 20
Step 11A. Install Overlay Panels 21
Step 12. Connect Water Supply 22
Step 13. Connect Power, Close Grille Panel 23
Step 14. Start Icemaker 23
Step 15. Install Toekick 24
Inspect Final Installation 24
Instructions for Flush Inset Installation 25
Planning Guide
The Installation Space 26
Dimensions and Clearances 26
Customization Basics 27
Custom Handle Design Guide 27
Refrigerator Location 27
Side Panels 27
1/2” Overlay Panel Dimensions 28
3/4” Raised Panel Dimensions 29
3/4” Raised Door Panel Routing 30
3/4” Raised Grille Panel Routing 31
Dispenser Trim 32
Side Cleats 32
Installation Instructions
Tools, Hardware, Materials 33
Grounding the Unit 33
Step 1. Remove Packaging 34
Step 2. Move the Refrigerator into the House 34
Step 3. Install Water Line 34
Step 4. Installation with Water Filtration System 35
Step 5. Install Side Panels 35
Step 6. Install Case Trim 35
Step 7. Anti-Tip Procedure 36
Step 8. Level Refrigerator 36
Step 9. Adjust Door Swing 37
Step 10. Install Grille Panel 37
Step 11. Install Overlay Panels 38
Step 12. Connect Water Supply 39
Step 13. Connect Power, Close Grille Panel 40
Step 14. Start Icemaker 40
Step 15. Install Toekick 41
Inspect Final Installation 41
Instructions for Stainless Steel Installation 42
Planning Guide
The Installation Space 43
Dimensions and Clearances 43
Customization Basics 44
Side Panels 44
Refrigerator Location 44
130° Door Swing 45
90° Door Swing 46
Installation Instructions
Tools, Hardware, Materials 47
Grounding the Unit 47
Step 1. Remove Packaging 48
Step 2. Moving the Refrigerator into the House 48
Step 3. Install Water Line 48
Step 4. Installation with Water Filtration System 49
Step 5. Install Side Panels 49
Step 6. Anti-Tip Procedure 49
Step 7. Level Refrigerator 50
Step 8, Alternate Anti-Tip Procedure 50
Step 9. Adjust Door Swing 51
Step 10. Connect Water Supply 51
Step 11. Connect Power, Close Grille Panel 52
Step 12. Start Icemaker 52
Step 13. Install Toekick 52
Inspect Final Installation 53
31-49171 Rev. 2