Technical data

1-18 Computer Group Literature Center Web Site
Hardware Preparation and Installation
1
8. Replace the chassis or system cover(s) and cable peripherals to the
panel connectors as required.
9. Reconnect the system to the AC or DC power source and turn the
system power on.
10. The MVME5100’s green
CPU LED indicates activity as a set of
confidence tests is run, and the debugger prompt
PPC6-Bug>
appears.