Installation Guide

1. Measure bathtub alcove to find center of
backwall. Scribe a light pencil line at this
point (at least 58” above top of bathtub).
Remove any objects that protrude into
bathtub alcove area below 58” such as
soap dishes or towel bars. Measure and
lightly mark the center of the top edge of
one of the flat panels — this will become
the center panel.
2. Accurately measure tub spout and
handle(s) hole location on alcove side
wall and transfer dimensions to one of
the remaining flat panels. Measure from
front edge of bathtub. You may want to
make a template (use shipping carton)
to check hole layout before you cut
holes into side panel. After you have
double checked your measurements,
using the proper size drill or hole saw,
cut out holes for outlets. Cut from front
(finished) surface.
Read instructions thoroughly before attempting installation. Package should be stored at room temperature (68ºF
min.) for at least six hours prior to installation. Turn off water supply to bathtub. Remove existing control valve
handle(s), cover plates and filler spout. If shower head is mounted less than 57” from top of bathtub, it must also
be removed. NOTE: Corner Panels must be installed first. Center and Side Panels overlap the Corner Panels.
Tr ial fit all five panels before applyiing adhesive to panels.
INSTALLATION
E.L. MUSTEE & SONS, INC.
5431 West 164th Street • Cleveland, Ohio 44142
SI-193 (12
04)