Recommended installation steps:
1. Determine venting requirements before deciding the fi nal location of the appliance.
2. Install rough framing (refer to “rough framing” section).
3. Place the appliance in its fi nal position.
4. Install nailing tabs (refer to “nailing tab installation” section).
5. Install appliance venting (refer to “venting installation” section).
6. Install all electrical wirings (refer to “electrical information” section).
7. Install gas lines (refer to “gas installation” section).
8. Test appliance.
9. Complete framing (refer to “fi nish framing” section).
10. Finishing (refer to “fi nishing” section).
Safety Barrier
10
9
5
4
6
7
3
2
For Universal Heat Management installation steps, refer to the leafl et provided with the Universal Heat
Management kit. Start Universal Heat Management installation before placing appliance in its fi nal position.
note: