User's Manual

CHAPTER 4 NDA-24300
Page 244
Issue 1
UNIT/CIRCUIT CARD REPLACEMENT PROCEDURE
[Circuit Card Accommodation into the New CPR]
The steps below show the procedure to install the new CPR into the LPM.
STEP 1 Using the Phillips Screwdriver, remove the 4 + 8 screws. Then, detach the
front panel and top cover from the new CPR. (Refer to Figure 4-4)
Figure 4-4 Removal of Front Panel and Top Cover from CPR
ATTENTION
Contents
Static Sensitive
Handling
Precautions Required
Top Cover
CPR
Front Panel
As shown in Figure 4-4, detach the front panel of the new CPR by removing the 4 screws.
Then, also lift away the top cover by removing the 8 screws.