User's Manual

NDA-24300 CHAPTER 6
Page 485
Issue 1
SYSTEM OPERATIONS
12.2.5 System Initialization by SINZ Command
The entire system can be initialized by execution of the SINZ command from the MAT, which is useful
for maintenance technicians who have to control the system from a distant location. Perform the pro-
cedure in Table 6-18.
Table 6-18 System Initialization by SINZ Command Procedure
ACTION REMARKS
Use SINZ command to execute
initialization.
START
END
Execution of Initialization
Confirm the following lamp indications:
[CPU DSP #0] CPU OPE: steady-green
IMG0-3: flash (green)
[CPU DSP #1] IMG0: flash (green)
Use ATIM command to adjust date and
time.
Note:
When the system is
initialized, the MAT is
once disconnected. Then,
log in to system again.
When the initialization com-
pletes, ACT0 lamp lights
green and ACT1 lamp goes
OFF on EMA (PH-PC40)
card.
For information about SINZ
command, see Chapter 8.