User's Manual

CHAPTER 6 NDA-24300
Page 492
Issue 1
SYSTEM OPERATIONS
Table 6-21 Start-Up When Basic, Application Software, and
Office Data Installed [Procedure #2]
ACTION
7SEG LED/OPE LAMP/KEY
SETTINGS
STATUS LED (right) on
the DSP of CPU is ON.
STATUS LED (right) on
the DSP of CPU is ON.
STATUS LED (right) on
the DSP of CPU is ON.
STATUS LED (right) on
the DSP of CPU is ON.
Press the CPU RST button
on the DSP of active CPU.
or
Turn OFF the SW on the PZ-
PW92 of active CPU and
turn it ON again.
Set the SENSE switch at 2
(DM Load Restart) on the DSP
of CPU #0.
Set the SENSE switch at 2
(DM Load Restart) on the DSP
of active CPU.
HD Initial
Program Load
Office Data Load
System Initial
Turn ON the SW on the PZ-
PW92 of CPU #0.
STARTSTART
When Power is OFF
and OFF LINE
A
When Power is ON
ATTENTION
Contents
Static Sensitive
Handling
Precautions Required