POST INSTALLATION TEST
Fusion and Non-Fusion Connection Tests
4.1 When Seizing a Trunk from a Station
STEP 1: Using the MAT command, make busy all trunks in the route except the trunk to be tested.
STEP 2: Station A in self-node (Node A) dials the Physical Station Number for Station B in Node C.
STEP 3: The call terminates to Station B via FCCS and non-FCCS.
STEP 4: Confirm the speech condition is sufficient (no noise, not one-way speech, etc.).
STEP 5: Replace the handset of STN A.
STEP 6: Repeat the above steps for all Fusion links.
4.2 When Seizing a Trunk from an ATTCON
STEP 1: The operator at the ATTCON in Self-Node (Node A) dials Physical Station Number for Station B in
Node C.
STEP 2: The call terminates to Station B via FCCS and non-FCCS.
STEP 3: Confirm the speech condition is sufficient (no noise, not one-way speech, etc.)
STEP 4: The operator at the ATTCON releases the call by pressing the CANCEL key.
Figure 6-13 CCIS-FCCS Outgoing Call Test
Check
Check
LC
LC
STN B
TELN: 420000
STN: 2000
STN A
TELN: 410000
STN: 2000
ATTCON
Node A (Self-Node) Node CNode B
ATI
FCCS Non-FCCS