Owner manual

Slide the boot onto the cable.
Solder the wire ends in the order Sleeve, Ring
and Tip.
Position the chuck onto the cable and align
chuck with plugfinger.
Finish the installation by tighten the bushing
onto the connector.
Attention:
If using a cable with O.D. > 5.50 mm [0.216”] break
off marked part of the chuck.
Prepare cable as shown.
Push the cover to the stop position on the shell.
A
B
C
E
F
A
D
B
C
NP2RX
NP3RX
F
E
D
break off
20
[
0.78”
][
0.78”
]
5
[
0.20”
][
0.20”
]
Ring
Tip
3
[
0.12”
][
0.12”
]
8
[
0.32”
][
0.32”
]
10
[
0.39”
][
0.39”
]
Sleeve
4
[
0.16”
][
0.16”
]
20
[
0.78”
][
0.78”
]
10
[
0.39”
][
0.39”
]
NP*RX 1/4” Professional Phone PlugRight-Angle
|
Draft. Nr.: BDA 180-0 Update: 17.12.2008/ 3102M1511
II
Data subject to change without prior notice. 2008 NEUTRIK . ALL RIGHTS RESERVED.©
®
www.neutrik.com
ASSEMBLY INSTRUCTION
R
R
NEUTRIK AG
NEUTRIK USA Inc.
NEUTRIK UK Ltd.
NEUTRIK
T: F:
T: F:
()
T: F:
T: F:
LI
USA
UK
DE/NL/AT/DK
+423 / 237 24 24 +423 / 232 53 93
+1 704 / 972 3050 +1 704 / 438 9202
+44 1983 / 811 441 +44 1983 / 811 439
+49 8131 / 280 890 +49 8131 / 280 830
Vertriebs GmbH
NEUTRIK France
NEUTRIK Tokyo Ltd.
NEUTRIK
FR
JP
HK
T: F:
T: F:
Ltd. T: F:
+33 1 / 4131 6750 +33 1 / 4131 0511
+81 3 / 3663 4733 +81 3 / 3663 4796
+852 / 2687 6055 +852 / 2687 6052
Hong Kong

Summary of content (1 pages)