Installation Guide

Unpacking
• Begin by placing the package on a covered at surface.
• Remove all cardboard, foam packaging material and clear plastic bags.
• Dispose / recycle all packaging materials.
Verify all the contents in the box and gather the required tools. See “Parts” and Tools Needed in the list below.
Handles
Handle Bolts (M4 x 22mm)
2
6
4
Bottle
Cabinet
#8 x 25mm Screws
Parts Supplied
Tools Needed
1 x Tape Measure
1 x #2 Phillips Bit
(opitional)
1 x Pencil
1 x Cordless Power Drill
(optional)
1 x #2 Phillips head
screwdriver
1 x Flashlight
(optional)
1 x Drill Bit
2.5mm or 3/32”
Handle Screws
#8 x 25mm
Handle Bolt
M4 x 22mm