Installation Guide

18
1
Wine Rack, Ice Tray
and Garbage Bin Installation
Set rack on top of 4 clips at the same
2
level height. Store beverage bottles.
Remove and install Garbage bins
Remove and install beverage chilling
tray with formed metal edge.
3
3
Open Doors. Set rack clips in the
desired slot locations on the
upright posts.
Slide beverage chilling tray into/out of
pullout frame. Push in frame to dock.
4
Slide Garbage bins into/out of pullout
frame. Push in frame to dock.
5
5
6
Bar Specic Instructions