Instructions / Assembly

4
Unpacking
Begin by placing the package on a covered at surface.
Remove all cardboard, foam packaging material and nylon bags.
Dispose / recycle all packaging materials.
Verify all the contents in the box and gather the required tools. See Tools Needed” in the list on
next pages.
Product Inspection
Check to see all parts are received as per the
order placed.
Contact NewAge Products at 1-877-306-8930;
for any missing parts.
Inspect the products for any damages before
starting the installation.
Go through the installation instructions carefully
before starting the installation.
Two or more persons are required to install the appliance Carts shown in this Installation Manual.
The illustrations shown in this Install Manual are for representation purpose only. Actual sizes of
the parts supplied in the package can be slightly dierent by appearance. Appearance of
hardware sizes are enlarged for ease of understanding for the customer.
IMPORTANT NOTES
Tools Needed
1 x Box Cutter
2 x 6mm
Open Wrench
1 x #2 Phillips head
screwdriver