Installation & Assembly

Decking Installation Guide / v20191125US 16
4
Once all clips are screwed down, the next
board will come in at a 30-45 degree angle
and then pushed down into place as shown
in Diagram 28.
5
Repeat steps 1-4 until the deck is complete.
DIAGRAM 29
DIAGRAM 28
DIAGRAM 30
6
The nal installed clips should look like
Diagram 29.
Note: The locking clip is in the middle of
Diagram 29 to show the expansion and
contraction is happening in both directions.
For more information on how to install the
locking clips and their placement, check
page 8 of this installation guide.
UL-1
UL-2
Note: The following shows how to install the
TC-10 and T-Clip. A starting accessory (MG-3/
TC-5 (SC-25) ) still needs to be used to install
the rst board.
1
First, slide the TC-10 and TC-2 clips into the
grooves of the boards with screws facing
up as show in Diagram 30.
Option 3:
T-Clip and TC-10 Locking Clip Installation
Locking Clip (TC-10)T-Clip (TC-2)
DIAGRAM 31
2
After getting all the TC-10 and TC-2 clips
into position above each respective joist,
begin to fasten them from above as shown
in Diagram 31.
3
Repeat steps 1-2 until the deck is complete.