Step 1
Starting from the left, take a full panel and attach the bottom tongue into the starter strip groove,
lock in place, and slide the panel behind or against the accessory piece. Using the screw guide
points, screw through the substrate and into a stud, when practical, with a minimum of 6 screws
per panel and a screw no less than 1" from each end of the
tongue as well as in the bottom right corner of the tongue.
Working left to right continue installing panels to the bottom
course making sure each panel is properly set in the starter
strip. For the last panel in the course, measure from the edge of
the grout line to the accessory piece and add 1". If installing
behind corners, cut the last piece and slide behind or against
the accessory piece until the panel is locked in the starter strip,
then slide panel back to the left until the shiplap sides are joined. Check for level.
Step 2
Install the remaining courses by beginning the second course from the
left using the off fall from the previous course if possible. Slide the
panel down over the tongue of the first row. Then slide the panel left
behind or against the trim piece and screw in place as before. Install
remaining panels in the course, end row as before, and check for level.
Align panels using the alignment mark at each side on the tongue. Do
not align panels using the top of the tongue. The remaining courses are
installed the same way. Stagger the NextStone butt joints so that no
two courses are aligned vertically unless separated by three courses.
All exposed edges should be behind trim pieces or painted to finish.
Step 3
Cut panels around fixtures and other wall protrusions (hose bibs,
electrical boxes, dryer vents, etc) to accommodate NextStone
Mounting Blocks. See page 25 for details on how to cut panels
and install the mounting blocks.
PANEL INSTALLATION
OPTIONAL ADHESIVE INSTALLATION
Step 1 - Lightly sand ridges on the back of the panel to remove any mold release agent that may
have adhered to the panel. The mold release agent will interfere with the adhesion of the panel.
Step 2 - Apply a " bead of adhesive along vertical ridges of the panel.
Step 3 - Remember to always use a quality adhesive and is compatible with polyurethane. See
page 8 for manufacturer’s recommendations. In order for adhesives to set properly, mechanical
fasteners may be required to hold panels in place.
2 3 4 1
1 2 3
4
All products must be allowed to acclimate; removed from boxes and stored flat at the
installation site for a minimum of 48 hours or until properly acclimated prior to
installation. Heat and moisture cause expansion. Best results are obtained by installing
cool, dry product. NextStone does not warrant against gapping caused by expansion