Installation Guide

What’s In The Box
One (1) DLF
Two (2) Screws
WARNING:
•Risk of electric shock. Disconnect power at fuse or circuit breaker before installing or servicing.
•To prevent early lamp failure, lamp should only be installed in operating environments between -20°C and + 40°C (-4°F and 104°F)
•No user serviceable parts inside. To avoid electric shock do not disassemble product.
•This product is not intended for use in emergency light xtures or exit signs.
ATTENTION:
Unit must be installed into a UL Listed junction box
Turn power o before inspection, installation, or removal.
Suitable for use in wet locations.
Use only on 120VAC, 60Hz circuits.
DLF Surface Mount LED Downlight
INSTALLATION INSTRUCTIONS
Model:
DLF2
Tools Needed
This LED Surface Mount Downlight requires very few tools for
installation. A screwdriver and a pair of wire cutters will help to
install the downlight to a J-Box or housing.
Make sure building wires are accessible
from J-Box.
Strip back building wires minimum 3/8”.
2
5
3
Remove faceplate from light by pulling up on
one edge until faceplate pops o.
4/O, 4” Non-Metallic and Remodel Ceiling Box Installation
Make sure all power is turned o before beginning installation
Splice xture wires to the building wires with push-in
connectors (included): black to line (black), white to neutral
(white), and green to ground.
Carefully tuck wires into J-Box.
4
J-Box
LINE
Black (line)
Ground
White (neutral)
Black (line)
Green (ground)
White (neutral)
DLF
Fixture comes with three sets of holes.
1) Keyholes for most standard 4” boxes
2) Through holes for second set of holes in most 4” boxes
3) A “clocked” through hole and through slot for installation
into Allied Moulded Products berglassBOX™ junction boxes.
Note: When installed through “clocked” holes, the xture will
not sit centered in the junction box.
1
1
2
2
3
3

Summary of content (2 pages)