Installation Guide

5
4
5 inches
TAB
Drawer Box
Release
1 1/2 IN.
20
7
/
8
in.
1 1/2 IN.
20
7
/
8
in.
1 1/2 IN.
20
7
/
8
in.
1 1/2 IN.
20
7
/
8
in.
STEP 5: Single Wall Box Installation (cont’d)
5i Cement, block, brick or tile walls will require screw anchors (not included).
5j Insert the 10 x 2 ½ in. Washer-Head Cabinet Box Installation Screws (not
included) into the holes until they are nearly tight. Make sure that the back if
fully supported with shims, as needed, and does not bow into any imperfections
in the wall.
5k Check that the box is level and plumb; Adjust as needed.
5l Fully tighten the screws and install the adjustable shelves (B).
NOTE: The Install Guide Rail assists in installation. The cabinet box itself must still
be screwed to the wall.
Important: Structural modications of a wall box can signicantly weaken the box.
For this reason modications, such as cutting the back to clear wall obstructions is
not recommended. If an obstruction exists, we suggest you rst try to use box(s)
that do not require modications. If modication is required, the warranty of the
box is void and it is the responsibility of the installer to take appropriate steps to
compensate for any loss of strength or support due to the modication.
STEP 6: Base Box Installation Preparation
NOTE: If installing wall boxes, all wall boxes should be installed prior to installation
of the base boxes.
6a First remove drawer(s) from the box. See Step 7.
6b Gently lay the base box on its back.
6c With the supplied adjustable legs (CC), insert the dowel on the top of the leg
into the 4 pre-drilled holes on the bottom of the box.
6d Verify the legs are pushed in ush with the box bottom.
6e Take the supplied #6 x 5/8 in. screws (FF) - 4 screws per leg - and fasten the
legs to the bottom of the box.
6f Verify the tab on the legs is positioned as shown in the diagram and over the
small alignment holes.
6g Adjust the legs so they are 5 in. in length from the bottom of the box by rotating
the bottom of the leg clockwise to lengthen and counterclockwise to shorten.
This will save time when leveling the boxes later.
6h By setting the legs at 5 in., your boxes will be 35 in. tall and line up with your
previously marked reference line on the wall.
NOTE: Carefully pick the box up from the bottom and place in position. NEVER
drag the cabinet box across the oor.
STEP 7: Base Drawer Box Removal
7a Remove drawer boxes by fully opening the drawer and lifting up on the box
until it releases from the glides.
7b Proceed to Step 8.
STEP 9: Base Drawer Box Installation
9a Install the drawer boxes by placing the drawer box on the guide rails and rmly
pushing the drawer straight back into the box.
9b The drawer will click on to the guide rails and be secured. Test by opening and
closing the drawer.
STEP 8: Base Box Installation
8a Start installing the base boxes in the corner of the design. (See Corner Base
Box Installation Instructions)
8b Make sure the box faces align both horizontally and vertically.
8c With the provided connecting bolts and nuts (AA), fasten the two boxes
together through the 4 pre-drilled holes located on each end of the box.
8d Verify the boxes are level and square. Adjust the legs if the boxes are not level
by turning the bottom of the leg clockwise to lengthen the leg and counter-
clockwise to shorten the leg.
8e Verify the box legs are rm against the oor to evenly distribute the weight of
the box. Failure to do so may result in damage to the boxes.
8f Drill through the base box back where the support rail is located and into the
pre-located studs with a 3/32 in. diameter drill bit, approximately 2 in. deep.
8g Holes should come no closer than 2 in. to any inside vertical edge of the box
and no further than 3.5 in. from the top edge of the box.
8h Insert the #10 x 2 ½ in. Washer-Head Cabinet Box Installation Screws into the
predrilled holes until they are nearly tight.
8i Verify the back is fully supported, shimmed as needed, and does not bow into
any imperfections in the wall.
8j Check to ensure the box is level in all directions and adjust as needed.
8k Fully tighten the screws and recheck for level and square.
8l Repeat to install the rest of your base boxes.
8m Proceed to Step 9
STEP 10: Toekick Installation
10a Install the toekick (sold separately) after all base boxes are installed. Begin by
laying your toekick face down against the Adjustable Legs (CC).
10b Mark and cut the toekick to the correct length. For the end of boxes returning to
the wall, cut the board to 20 7/8 inches.
10c Take your pen/pencil and straight edge and mark the center of the Adjustable
Legs (CC) as shown in Image 1.
10d Attach the included Toekick Attachment Plates (EE) to the toekick with the
provided #6 x 5/8 in. at head Phillips screws (FF). The highest Attachment
Plate (EE) should be 1-1/2 in. from the top of the toekick as shown in Image 2.
Use two Attachment Plates (EE) on each end return board. Use two Attachment
Plates (EE) per cabinet for the front board.
NOTE: If there will be two toekick boards meeting at a right angle (as when
installed on the front and side of a cabinet) remember to offset the mounting heights
of the toe kick plates so they do not interfere with one another.
10e Slide the provided Toekick Clips (DD) into the Toekick Attachment Plates (EE)
so the toekick is ready to be secured to the Adjustable Legs (CC). Image 3.
10f Install the toekick to the Adjustable Legs (CC) by pushing the Toekick with the
Toekick Attachment Plates (EE) onto the Adjustable Legs (CC) of the cabinet as
shown in Image 4 until all of the Toekicks are installed.
INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS
Installation Videos at: benimble.com Installation Videos at: benimble.com
1
2
3
4