User guide

-
-
I
I
N
N
S
S
T
T
A
A
L
L
L
L
A
A
T
T
I
I
O
O
N
N
M
M
A
A
N
N
U
U
A
A
L
L
-
-
09/12 Rev. B 143573
28
WIRING
The connection to power supply may be carried out at the back of the appliance after
removing the protection grid. (pict.31)
Pict.31
CONNECTION TO CONDENSATE DRAIN
Pict.36
On certain models, a condensation discharge 1.2” diameter hose
installation is necessary, ("SAREL" or any similar type). The
current general and local regulations pertaining to drains are to be
complied with. (pict.36)
The guarantee is voided and the Manufacturer will not be liable for any damage to appliances or
operators arising from the non-compliance with and tampering to any part of the appliance
(electric, thermodynamic or hydraulic plant).
TESTING
Carry out the following checkings:
1) Ambient temperatures must be between 50[°F] and 90[°F].
2) Check power input.
3) Carry out at least one full quick cooling cycle
If the appliance was transported horizontally instead of a vertical position DO NOT START THE
APPLIANCE IMMEDIATELY. WAIT FOR AT LEAST 4 HOURS BEFORE OPERATING.