As each wall panel or corner panel is erected and locked in an
adjoining panel along the vertical joint, engage the section latches to
the floor panels by turning the hex locking wrench ONLY ABOUT 1/4
TURN CLOCKWISE.
Make certain that the wall or corner panel is perfectly aligned with the
floor panel or foamed sealer
before engaging the section
latches.
Continue erecting panels
according to the part numbers shown
on the floor plan, and follow, explicitly,
the technique described for panel
alignment.
CEILING PANELS will be erected at
specific intervals to facilitate the
installation. The intermittent ceiling
panel erection is scheduled to allow the
ceiling panels to serve as supporting
ties between opposite walls as the
installation progresses. CAUTION!
DO NOT SLIDE CEILING PANELS INTO POSITION! To avoid gasket damage,
elevate the ceiling section clear of the wall section while bringing it into position.
When adjoining ceiling panels are in position,
adjust the exterior edges so that they are
perfectly flush with one another and with the
wall panels directly below them. Lock the
ceiling panels securely to each other. DO NO
LOCK ceiling panels to wall panels at this time.
NOTE: If local conditions, such as existing
building walls, make it difficult to align ceiling
panels with each other from the exterior, locate
a step ladder near the interior walls to visually
inspect the alignment and adjust as necessary.
Walk-in insTallaTion -Wall & ceilinG Panel eRecTion