11. Are the lights installed, connected to the light switch and operating correctly?
12. Have all electrical and other penetrations been properly sealed as recommended
by Nor-Lake?
13. Is the temperature sensor extended away from door and mounted on the wall?
14. Is the strip curtain mounted in place and secured?
15. Are the refrigerant piping and electrical cable supported and strain free?
16. Is the serial tag correctly installed?
17. Has the surplus construction material been removed from the top of the walk-in?
18. Does the installation look professional?
Final Inspection of the Walk-in and Refrigeration Systems
Yes No Repairs Made GC Review *
Have the installation and maintenance manuals, wiring diagrams and other walk-in
documents been turned over to the end user?
Walk-In Model Number(s)
Walk-In Serial Number (s)
By signing below the installer hereby certifies that the installation has been completed in
compliance with Nor-Lake’s standards and to Nor-Lake’s specifications. Items found not in
compliance will be corrected by the installing contractor at no charge.
Refrigeration / Installation Contractor Name: _________________________________
Refrigeration / Installation Contractor Signature: _______________________________ Date: ________________
General Contractor Name: ________________________________________________
General Contractor Signature: _____________________________________________ Date: ________________
Contact Nor-Lake Installation
Nor-Lake, Inc.
Attn: Installation Department
P.O. Box 248
Hudson, WI 54016
(877) 503-5253