Instructions / Assembly

Attach remaining sections to Sec. "1" using the
3
/
8
" x 3
1
/
2
" hex bolts, washers, and nuts
provided. (See Detail #15) Do not completely tighten the bolts at this time. Attach Sec. "2"
to the front of Sec. "1". Attach Sec. "4" to the back of Sec. "1". Attach Sec. "3" to the top of
Sec. "2". Once all roof brackets have been assembled, fold the bracket forming a triangle.
Section "3" and "4" can now be adjusted to form a level vertical face on Sec. "2". Once the
face is level, you will need to drill two
3
/
8
" holes though Sec. "4" using the predrilled holes in
Sec "3" as a guide. Tip: A clamp can be used to hold Sections "2" and "3" together while
drilling the holes. Once this is completed, secure the two sections together with two 1
1
/
2
"
hex bolts, washers and nuts provided. All other sections of the roof mount bracket may now
be tightened securely. (See Detail #16) Complete the same procedure on the remaining roof
brackets. Now install one awning mounting bracket to the front of each roof mount bracket
with two
3
/
8
" x 1
3
/
4
" bolts with a washer under the head, and another under the nylock nut.
Be sure all mounting brackets are level and on the same plane. Tighten securely. You may now
return to Sec. 2-3 Awning Installation (Mounting the Awning pg. 7) at this time.
DETAIL #15
DETAIL #16
p.11