Instructions / Assembly

15
CONVERSION TO NATURAL GAS
WARNING!
The installation must be perf
leak tested before operating the appliance.
E
pipe dope on any hose connection.
Ensure the hose does not contact any high temperature surfaces or it may melt and leak
Locate the hose away from pathways where people may trip over it and areas where the
hose may be subject to accidental damage.
Leak test all the connections using a soap and water solution as per the leak testing
instructions found in the manual.
Natural Gas Hook-Up
The gas appliance is designed to operate at an inlet pressure of 7 inches water column. The piping up to the appliance is the
end of the inlet valve. Tighten using two wrenches. (Do not use thread sealer/pipe dope.) Leak test all joints prior to using the
installed in an upward direction and a readily accessible manual shut-off valve must be installed upstream of, and as close to,
the quick disconnect as is feasible.
Purge the gas supply line of any trapped air prior to the of the unit.