Operation Manual

ARYAL S1 E
L R
ø ø
H
H
X2
9 - 10 101,6 115,6 47 65
12 183,6 123,6 47 65
ENGLISH
EN - 17
2.5 - INSTALLATION OF THE INSIDE UNIT
2.5.1 - Installation of fastening plate


a. Position the plate against the wall.
b. Mark the drilling points, making sure that they are level.
c. Make the holes necessary in the wall using a suitable bit.
Make sure there are no pipes or electric ducts in the drilling area.
d

e. If the wall is in wood, use relevant countersunk-head screws (not supplied).
f. Check the stability of the plate (7), moving it laterally and vertically.
2.5.2 - Realisation of pipe passage holes
If the connection lines arrive from the rear right of the indoor unit, a hole Rmust be made for passage of
the piping,

a. Make a 8÷10 mm hole in the centre of the position “R”, with slope towards the outdoors of 5% (to allow

b. Make the hole “R
c. Insert the drain line piping and that of refrigeration into the hole along with the electric connection cable.
If the connection lines arrive from the rear left of the indoor unit, a hole L” must be made for passage of the

Model L
mm
R
mm
H
mm
ø
mm
Per le tubazio

indoor unit