The AC input (generator or utility grid) must be a single-phase source of the proper voltage and frequency.
When wiring the AC source to the inverters, local codes may require the inverter circuits to be located at the
opposite end of the panel from the main circuit breaker. This prevents overloading of the AC bus.
Figure 24 Parallel Wiring (Four Inverters)
NOTES:
1. Neutral (common) conductor may
be connected from only one inverter
neutral terminal to a common bus bar
in the AC conduit box.
2. Colors shown here may be different
from wiring standards.
CAT5 Cables
AC Source
(Utility Grid or
AC Generator)
AC Conduit
Neutral
TBB
GND Hot L1 TBB
MATE3
AC
Neutral
IN
AC
Hot IN
(L1)
HUB/
MATE
Input
Circuit
Breaker
AC
Hot OUT
(L1)
GND
Output
Circuit
Breakers
Bypass
Circuit
Breakers
Mechanical Interlock
Neutral TBB
GND Hot L1 TBB
AC Loads
Ground TBB
(may be within
AC Conduit Box)
LEGEND
Ground
Hot L1
Neutral
TBB = Terminal Bus Bar
HUB 10.3
10 9 8 7 6 5 4 3 2 1 MATE
Input
Circuit
Breaker
AC
Neutral
IN
AC
Hot IN
(L1)
HUB/
MATE
L1 Slave
AC
Neutral
OUT
AC
Hot OUT
(L1) GND
Inverter
L1 Master
Inverter Inverter
L1 Slave
Inverter
L1 Slave
Input
Circuit
Breaker
Input
Circuit
Breaker
AC
Neutral
IN
AC
Hot IN
(
L1
)
HUB/
MATE
AC
Neutral
IN
AC
Hot IN
(L1)
HUB/
MATE
AC
Neutral
OUT
AC
Hot OUT
(L1)
GND
AC
Neutral
OUT
AC
Hot OUT
(L1)
GND
AC
Neutral
OUT