Installation Guide

Installation
18 900-0144-01-01 Rev B
Figure 13 AC Terminals, Ports, and Ground Bus
WARNING: Shock Hazard
After installation, do not remove the covers while the inverter has any source of power. See the Operator’s
Manual for the shutdown procedure before removing the covers.
REMOTE and BATTERY TEMP
PORTS: Receive the RJ45 and
RJ11 plugs from the MATE3
system display and Remote
Temp Sensor. See page 24
for
instructions.
AC TERMINAL BLOCK
Receives AC input wires
for two input sources.
Also receives AC output
wires. All neutral wires are
electrically common. See
page 22 for instructions.
CONTROL WIRING TERMINAL
BLOCK: Receives control wires for a
variety of functions, including
generator control. See facing page for
terminal descriptions.
GROUND BUS Receives
ground wires from multiple
locations. See page 19 for
instructions.