Instructions / Assembly

Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 12
24. To complete your Breeze, position 2 Post Skirtings with Cleats (J) on opposite sides of Post with
Dado cuts facing to the inside as shown above. Cleat should be aligned tight against Post and not
against Post Mount Hardware.
Post Skirtings - (K)
Post Skirtings with Cleat (J)
25. Slide the tongue and dado cuts of both Post Skirtings (K) Pieces into the ajoining tongue and
dado cuts of Part J. Align all skirting pieces evenly at top. Carefully secure Post Skirtings together
with with 1 - 1 1/4” screw per dado cut side. (1 per side).
Important - Drill 1/8” pilot hole first to prevent wood from splitting!
Post
Skirting
Caps (L)
Post Mount
26. Secure Skirting Unit to Post by screwing 1 - 2” SS Screw into each Post Skirting with Cleat (J).
Align Post Skirting Caps (L) tight against Post and equally from side to side of skirting frame. Nail
Cap down into Skirting with 3 - 2” SS Finishing nails per piece. Complete remaining Post Skirtings.
dado cut
dado cut
Post Skirting
with Cleat (J)
dado cut
tongue cut
Post Skirting (K)
1 - 2” Stainless Screw in middle of Part J