Instructions / Assembly

2. Lift up a completed
Post/Girder Section slowly and
carefully. Make sure B-Girders
are facing outward.
3. If Post Mount Hardware is
installed, position bottom of Posts in
Hardware.
4. Secure Post to Post Hardware with appropriate
hardware such as lag bolts or a sufficient number
of screws.(Hardware Not Supplied)
Post
Hardware
Lag Screws
(not included)
5. Locate Girder (C)
and lift into
position between
both B-Girders. The
C-Girder has a deep
notch facing up on
each end.
Deep Notch facing Up.
Girder (B) to outside
C
Important: you will need the help
of 2-3 people while lifting and
positioning the completed
Post/Side Girder Sections into
place.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 5