Full Product Manual

Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 6
2. Locate 4x4 Foundation
Framings. 2 front / 2 rear - 44.5”
long & 4 sides - 47 3/4” long. Lay
on sand base. Position and level
using straight 2x4 and level. Make
a footprint so outside dimensions
are approximately 96” wide x 96”
long. Screw ends of 4x4 together
with 2- 3” screws per end.
Optional- Secure 4x4’s to ground
with Tie Down Kit or Rebar. See
D. on Foundation Page.
44 1/2”
47 3/4”
96”
95 1/2”
3” screws
3. Position and cut Landscape Clothe to fit inside
4x4 Foundation Framing. Lay approximately 3-4” of
Small Gravel and pack down.
Landscape Clothe
Small Gravel
You can find the
Square Drive Bit
for the screws in
with the Hardware
Kit Bag.
95 1/2”
Completed Foundation