Installation Guide

1. Start by installing bottom Greenhouse Clips (A) first. Measure 10” from the outside frame horizontally
and recessed 1/2” down as illustrated above. Hold into position and make a shallow 1/16” diameter drill hole.
Clip includes #1 square head screw. Fasten initially with screw gun and screw bit provided. Finish with
Screwdriver. Important - Easy to crack clip when tightening with screw gun, finish tightening with screwdriver.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 2
Part A 34 - Greenhouse Clips with
screws. (32 required / 2 extra).
Part B
6 - Side Greenhouse Panels
34 1/2” wide x 11 1/2” high
Part C
2 - Top Greenhouse Panels
34 1/2” wide x 36” deep
C
A
Exploded View and Parts List for 6x3 Raised Bed Greenhouse Kit.
Hardware Kit (Provided)
Screw Gun/Drill
Tape Measure
Tools Required (Not Provided)
1/16” Drill Bit
Parts List
C
B
#1 Square Drive Bit x 1 pc
1/2”
10”
B
B
B
B
B
1/16”Bit
Screwdriver
#1 Square Drive
34 1/2” wide
36” deep
Use #1 Bit (provided)
in your multi
screwdriver.