Installation Guide

12
1. Drill pilot holes with a ø3mm (1/8in) drill bit.
2. Secure the clamp (R) onto the base with screws (UU). Ensure the plastic gasket in the guide is in place as it
protects the side panel.
3-4. DrillpilotholesinthemarkedlocationsofthexerwithaΦ8mm(5/16in)drillbit.Insertthewallanthor(EE).
5-6. Install the side panel (O) and the support bar.
7-8. Scurethexer(P)tothewallanthor(EE)withscrew(DD)andthecap(TT).
SIDE PANEL INSTALLATION
EE
5
8
7
4
Φ8mm
5/16in
3
1
2
Φ3mm
1/8in
UU
R
EE
DD
TT
OO
SS
PP
QQ
RR
6