Installation Guide

9
1. Ensure the base and walls are leveled. Place the metal track (B) approximately 20mm (3/4in) from the edge
of the base to the center of the metal track. Ensure the metal track (B) is leveled, then mark the holes clearly
on the wall using a pencil.
2.Removetrackanddrillpilotholesinthemarkedlocations.UsingΦ8mm(5/16in)ceramicdrillbit.
3.Insertthewallanchors(EE)usingarubbermalletuntilthewallanchorsareushwiththewall.
4. Replace and secure the metal track (B) with screws (CC). Do not overtighten.
WALL TRACK INSTALLATION
4
20mm
3/4in
20mm
3/4in
EE
CC
B
Note: Insert the door panel’s bottom seal strip (L) at the base of door
panel (C) and cut the surplus with a cutter. Place the door panel (C)
inside the shower enclosure to facilitate future steps.
Φ8mm
5/16in
2
3
Helpful Hint
Make sure there
is a support stud
located behind the
drywall, behind the
tracks!
1
B