Specification

Table Of Contents
Acoustic Ceiling Products (ACP)
Palisade Wall PVC Panels Section 09 51 01
February 2021 PVC PANELS
Page 4
1. Prepare substrate surface by cleaning properly. (free of dust and organic material
that may impede adhesion)
2. Apply adhesive to substrate using a notched trowel or tube adhesive with proper
coverage.
3. Install full panels, working across the room.
4. Overlap tongue and groove tiles.
5. Once completed, firmly press all wall panels to ensure proper adhesive bond.
D. Perimeter Molding:
1. Install edge trim at the ends of your wall if desired.
2. Use single piece longest practical lengths.
3.3 SCHEDULE
END OF SECTION