Instructions / Assembly

Notes During
Assembly
Use a soft platform below the
parts to avoid scratches and damages.
Please note you install the
panels with the UV protected side out (marked with "THIS SIDE
OUT")
and peel the film strip covering
the panels.
Product dimensions can be
adjusted to your specific needs:
1.The wall-mounting profile
(top-back) can be adjusted from 260 to 305 cm (102.4" to
120") above ground. The
adjusting is done when
measuring and drilling (Step 5).
Please note the installation
recommendations' height suggested in Diagram A.
Please note that the product
appearance may slightly change as a result, however snow
load weight does not change.
2. Poles distance from the wall
can be adjusted from 226 to 286 cm (89" to 112.6") as
suggested in Diagram B1.
Poles distance from the side
edges can be adjusted from 5 to 54 cm (2" to 21.6") as
suggested in Diagram B2.
The adjusting is done after
assembly and before anchoring (Step 16) by sliding poles and
profile 8619+8620 at the roof
profiles' channels.
3. Wall mounting and distance
from the wall determine the roof angle and the total depth
of the product (distance of
gutter from the wall). Higher wall
mounting and shorter distance between wall and poles
increase the roof angle and
shorten the total depth as
suggested in Diagram C.
Ste'
Step 5: It is important to plan the
installation area, mark as per the instructions and level
the surface prior to the
assembly. Make sure you use
suitable screws and anchors.
Step 7: Apply silicone sealants
above beam 7288, in order to prevent water from seeping
in.
Step 9: Make sure that the angle
between the back wall profile and the panel supporting
profiles is 90 degrees.
Step 11: Please note you install
the panels with the UV protected side out (marked with
"THIS SIDE OUT")
and peel the film strip covering
the panels.
Step 14a: Apply silicone sealants
on the inner part of 7997, and connect to the profile as
depicted in drawing 14a.
Step 14c: Do not tighten screw
4043 yet, in order to allow the final adjustments done in
step 16b.
Step 16a+16c: Please adjust the
poles (inside out and sideways) by sliding them to their
final position prior to
anchoring. Make sure that the
poles distance from the Patio cover side edge does not
exceed 54 cm/21.3':
Step 16b: Adjust the gutter
head's angle according to your needs and tighten screws 4043.
Step 18: Anchoring this product
to the ground is essential to its stability and rigidity. It is
required to complete
this stage in order for your
warranty to be valid.
*Tighten all screws when
completing assembly.
No e:
The wall anchoring kit
supplied with this product is suitable only for concrete walls.
Other wall types need an
accordant wall fixation kit.
II
260-305cm
102.4"-120"
B1
226-286cm
89"- 112.6"
13°
EH
17°