Installation Manual

Page 8
301 Fulling Mill Road, Suite G ©Copyright 2008 by On-Q/Legrand,
Middletown, PA 17057 Inc All Rights Reserved.
(800)-321-2343 www.onqlegrand.com
Selective Call Patio Unit(s)
The procedure to trim-out the Patio Unit(s) is as follows:
As shown in Figure 6, the first step to installing the
Selective Call Patio Unit is to place the included
weather proofing rear gasket against the gang or back
box, and secure the gasket in place with the included
mounting bracket.
NOTE: Insure that the mounting bracket is installed
with the center tab pointed up, as the Patio Unit will
be “hung” from this tab in a later step.
NOTE: There are slotted holes in the mounting
bracket to allow for leveling of the Patio Unit in case
the gang or back box was installed off level.
Use the four provided screws to attach the mounting
bracket to the gang or back box.
Pull the Cat 5 cable from the enclosure through the mounting bracket and terminate the cable
with an RJ45 plug and insert the plug into the RJ45 jack on the rear of the Patio Unit (see
Figure 7). Follow the T568A standards described in Figure 3.
Hang the Patio Unit from the top tab on the mounting bracket insuring the front gasket is in
place and against the mounting bracket.
Use the provided 1/16” allen wrench to tighten the two set screws at the bottom of the Patio
Unit.
Figure 6
rear
gasket
center tab
mounting
bracket
Figure 7
front gasket
RJ45
jack
set screws