Installation Instructions

GROUND
WIRE
* 48”
REQUIRED
LINE VOLTAGE-
CABLE
LINE VOLTAGE CABLE
BASE SECTION
CAP NUTS
SPRING
WASHERS
5.1 Insert the line voltage cable inside the base and mount the base onto
the three (3) anchor bolts. Secure the base with the three (3) spring
washers and cap nuts provided.
5.2 Pass the wire exiting each arm through the holes in the spreader.
Using the 6 (M5 x 14) screws and 5mm teeth washers, secure each of
the arms onto the spreader using the provided 8mm tool.
5.3 Join all three (3) arm wires and connect to the main streetlight
cable using wire nuts.
5.4 Attach the post cap on top of the spreader with the three (3)
M4 x 12mm screws and 4mm teeth washers.
5.5 Attach the spreader to the top post using the provided 3 set screws
(M6 x 9.5).
5.6 Attach the top and mid post sections by screwing them together in
a clockwise direction. Also, making sure to feed the streetlight cable
from the spreader down through the post sections.
5. Wiring and assembly
POST CAP
M4 x 12mm
SCREWS
ARM
STREETLIGHT
CABLE
TOP POST SECTION
MID POST SECTION
SPREADER
4mm TEETH WASHER
TOOL
TEETH WASHER
M5 X 14 SCREW
*Leave at least 48” of cable to be
able to connect the wire properly.